The right hand bunker is also going through some transformations of its own. Much like the bunker on the left, it is expanding, again encroaching on the new approach. The bunker is being reshaped to create more depth, while also injecting more aesthetic value. Much of the work performed thus far has been roughly shaped, leaving the fine details to be finalized when the weather breaks to accommodate such steps.
Drainage was also installed in what will be the new approach on seven. The drainage runs through the right hand bunker which will help in reducing standing water in the bunker itself. We're looking to remove as much water, both surface and subsurface, from the area to create a firm, and dry approach to encourage more shots to bounce up onto the putting surface.
Given the variable weather and the reduced crew size, significant strides have been made on the renovation of the seventh hole. When weather permits we will have to finalize both bunkers, as well as cap the entire approach with 3-6 inches of a top mix (sandy mix) to promote a more uniform root zone that allows for better water infiltration and thus firmer conditions. Although the snow has shut the project down, the silver lining here is that we're likely only a week or so removed from laying sod, and getting the hole ready for the 2015 season.
Expanded bunker on the left side of the seventh green. |
No comments:
Post a Comment